BIM Digital Platform | Civic Cultural Center
BIM PROJECT
{{ currentSlideData.applicationDomain }}
CORE VALUE
{{ currentSlideData.coreValue }}
TYPICAL SCENARIOS
  • {{ scenario }}
🏆 FLAGSHIP PROJECT
Municipal Cultural Complex
📐 118,000 m² GFA
🏗️ Steel-concrete
📍 East China
🎯 LOD 400
👥 36 Subcontractors
⚙️ 21 MEP Systems
{{ metric.value }}{{ metric.unit }}
{{ metric.label }}
{{ metric.sub }}
📊 BIM Performance Dashboard
📌 Project Overview

This key municipal public cultural project integrates cultural center, library, grand theater, and digital cinema across 118,000 ㎡. With 21 MEP subsystems and 36 subcontractors, full-process BIM consulting enabled multi-disciplinary integration, clash detection, 4D simulation, and 5D cost control.

⚡ Project Challenges
  • Multi-disciplinary Coordination – 36 participating units, high risk of distortion.
  • Complex MEP Conflicts – 21 subsystems, dense pipelines, strict headroom.
  • Special-shaped Construction – Hyperbolic GRG ceiling with 1,623 unique panels.
  • Tight Schedule Pressure – Early delivery required by owner.
✨ BIM Solutions
  • Five-party BIM Central Collaboration – Unified platform, 24h change response.
  • Three-stage Clash Resolution – 2,864 clashes solved pre-construction.
  • 4D Schedule Dynamic Control – Auto-alert for 3-day deviations.
  • Digital Construction Briefing – QR codes & VR roaming, ceiling 45d→28d.
🏆 Project Outcomes
28 days ahead delivery
¥7.46M total cost saved
98% MEP success rate
99% as-built completeness